Preparatory work before starting up slurry pump
Preparatory work before starting up slurry pump:
1. First of all, general inspection of the equipment, and further inspection.
2. The valve of slurry pump front or behind should be in the position of parking, and should be flexible, easy to use, strict.
3. Check the slurry fluid level in the barrel or tank.
4. All parts should be complete, no shedding, loose.
5. The lubrication condition of each lubrication point shall be sufficient oil, good oil quality and clean
6. Good supply of cooling water, water quality, water should meet the requirements.
7. Before starting the pump, manually turn the opposite wheel 1-2 times. If the wheel does not move, it is strictly prohibited to start.
Related recommendations
-
Notes for normal operation of slurry pump
109Notes for normal operation of slurry pump show ae below: ,
View details -
More about Slurry Pumps Slush Pumps and Sludge Pumps
96Hongstone slurry pumps are used to transport viscous liquids and liquids carrying solid particles. These pumps are designed so that particulate does not damage or degrade the pump components, or cause significant clogging. They can be effective o...
View details -
Slurry Pump Selection
123Characteristics of the Transport Medium (Slurry)Solid ParticleParticle Size Distribution: Maximum particle diameter, average particle size, particle size gradation. This affects the pump's flow passage clearances and clogging resistance.Particle ...
View details -
What should be considered when designing horizontal slurry pump
91The material must be able to bear slurry abrasion, erosion and corrosion.
View details
Hongstone Pump